{"data":{"id":"us-sd/sdcl-34a-6-75","jurisdiction":"us-sd","citation":"SDCL § 34A-6-75","heading":"Plan required for issuance of new or renewed permit.","body":"Beginning July 1, 1994, no new permit for a solid waste disposal facility may be issued and no existing permit reissued or renewed unless the permit applicant, in conjunction with all local units of government whose residents, businesses, or institutions generate solid waste to be stored or disposed of in the facility, has filed a plan as required in § 34A-6-74.\nSource: SL 1992, ch 254, § 38.","path":["TITLE 34A. ENVIRONMENTAL PROTECTION","CHAPTER 34A-6. SOLID WASTE MANAGEMENT"],"source_url":"https://sdlegislature.gov/Statutes/34A-6-75","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"f3e83f1f1b9d070862bf348c6d8df237eaa16945af059743b81655e659c1aaf8","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-34a-6-74","next":"us-sd/sdcl-34a-6-76"},"notice":"GroundRules: Original legal text. Not legal advice."}
