{"data":{"id":"us-sd/sdcl-38-8a-16","jurisdiction":"us-sd","citation":"SDCL § 38-8A-16","heading":"Permit-issuing authorities to require compliance with district conservation standards.","body":"After formal adoption of district conservation standards, each permit-issuing authority lying within the territorial limits of the conservation district, shall include provisions in its permit procedure to ensure that any proposed action relating to a permit is in compliance with the district conservation standards.","path":["TITLE 38. AGRICULTURE AND HORTICULTURE","CHAPTER 38-8A. SOIL EROSION AND SEDIMENT DAMAGE CONTROL"],"source_url":"https://sdlegislature.gov/Statutes/38-8A-16","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"1d9afe2dce25bffcf0db7d8bf52299aee8d54879f933eb3af137b01625e9652c","source_id":"us-sd","stale":false,"prev":"us-sd/sdcl-38-8a-15","next":"us-sd/sdcl-38-8a-17"},"notice":"GroundRules: Original legal text. Not legal advice."}
