{"data":{"id":"us-sd/sdcl-45-6b-13","jurisdiction":"us-sd","citation":"SDCL § 45-6B-13","heading":"Instrument of consultation not obtained--Hearing and order.","body":"If the instrument of consultation required by § 45-6B-12 cannot be obtained, the operator may request a hearing before the Board of Minerals and Environment. The board shall issue an order in lieu of the instrument of consultation if it finds:\n(1) That the operating and reclamation plans have been submitted to the surface landowner as provided in § 45-6B-12;\n(2) That the operating and reclamation plans detail the full proposed surface use, including proposed routes of ingress and egress; and\n(3) The planned reclamation will restore the surface land to future use, in segments if circumstances permit, as soon as feasibly possible.","path":["TITLE 45. MINING, OIL AND GAS","CHAPTER 45-6B. MINED LAND RECLAMATION"],"source_url":"https://sdlegislature.gov/Statutes/45-6B-13","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"2b6547215e8c2a64b81585a9f9396853f5312aeff17db10bb81df17ac0136469","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-45-6b-12","next":"us-sd/sdcl-45-6b-14"},"notice":"GroundRules: Original legal text. Not legal advice."}
