{"data":{"id":"us-sd/sdcl-45-6b-26","jurisdiction":"us-sd","citation":"SDCL § 45-6B-26","heading":"Surety penalty--Amount.","body":"The penalty of the required surety shall be in an amount sufficient to cover the cost of reclamation as determined pursuant to § 45-6B-21.","path":["TITLE 45. MINING, OIL AND GAS","CHAPTER 45-6B. MINED LAND RECLAMATION"],"source_url":"https://sdlegislature.gov/Statutes/45-6B-26","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"749a0e2ff811b16aefb86d35c5220fb3c0e63b8a0b0e45ced075062a88c1409e","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-45-6b-25","next":"us-sd/sdcl-45-6b-27"},"notice":"GroundRules: Original legal text. Not legal advice."}
