{"data":{"id":"us-sd/sdcl-46-4-6","jurisdiction":"us-sd","citation":"SDCL § 46-4-6","heading":"Time for construction and completion of dam.","body":"Any person appropriating the waters of any dry-draw or watercourse within this state, within sixty days after the filing of the notice provided for in §§ 46-4-3 and 46-4-4, shall begin the construction of the dam mentioned in § 46-4-1 for the storage or diversion of the waters, shall proceed diligently to complete the dam and shall divert the waters for beneficial use as rapidly as possible.","path":["TITLE 46. WATER RIGHTS","CHAPTER 46-4. DRY-DRAW AND NONNAVIGABLE STREAM DAMS"],"source_url":"https://sdlegislature.gov/Statutes/46-4-6","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"6051becdad829877ab67dab90ec52edeb9512d485cf570f0dda90259fd991db9","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-46-4-5","next":"us-sd/sdcl-46-4-7"},"notice":"GroundRules: Original legal text. Not legal advice."}
