{"data":{"id":"us-sd/sdcl-46a-10a-79","jurisdiction":"us-sd","citation":"SDCL § 46A-10A-79","heading":"Apportionment of original cost to annexed area when project extended.","body":"If an existing drainage project is extended or enlarged, the board or boards shall apportion the benefits resulting to the annexed area from the existing construction in the original project as a cost to be absorbed by the lands of the annexed area on the basis of the original cost of the drain.\nSource: SL 1985, ch 362, § 80.","path":["TITLE 46A. WATER MANAGEMENT","CHAPTER 46A-10A. COUNTY DRAINAGE"],"source_url":"https://sdlegislature.gov/Statutes/46A-10A-79","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"3dbff9dc3f2e1139823849dce873ea4a500eed4fea2d3c02996b906e083e4149","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-46a-10a-78","next":"us-sd/sdcl-46a-10a-80"},"notice":"GroundRules: Original legal text. Not legal advice."}
