{"data":{"id":"us-sd/sdcl-49-41b-10","jurisdiction":"us-sd","citation":"SDCL § 49-41B-10","heading":"Final report of committee.","body":"Within seven months after the application is filed the local review committee shall file a final report with the Public Utilities Commission which includes the recommendations of the committee as to mitigation measures and minority reports.","path":["TITLE 49. PUBLIC UTILITIES AND CARRIERS","CHAPTER 49-41B. ENERGY CONVERSION AND TRANSMISSION FACILITIES"],"source_url":"https://sdlegislature.gov/Statutes/49-41B-10","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"90bd81a467d0de5324b8f6dc24da5dc8839f18bdf4fd8b9c4f9b12327ed15a35","source_id":"us-sd","stale":true,"prev":"us-sd/sdcl-49-41b-9","next":"us-sd/sdcl-49-41b-11"},"notice":"GroundRules: Original legal text. Not legal advice."}
