{"data":{"id":"us-sd/sdcl-49-41b-4.1","jurisdiction":"us-sd","citation":"SDCL § 49-41B-4.1","heading":"Trans-state transmission facility--Permit and legislative approval required.","body":"No utility shall begin construction of a trans-state transmission facility within the state without first having obtained a permit as required in this chapter and approval by an act of the South Dakota Legislature.","path":["TITLE 49. PUBLIC UTILITIES AND CARRIERS","CHAPTER 49-41B. ENERGY CONVERSION AND TRANSMISSION FACILITIES"],"source_url":"https://sdlegislature.gov/Statutes/49-41B-4.1","current_through":"2026-08-31","vintage":"","retrieved_at":"2026-09-03T15:18:57Z","sha256":"b2e01e772225cc8e8f67712fe5ba79ff0f0cba1df1dd86eabe7239a1c25e25d5","source_id":"us-sd","stale":false,"prev":"us-sd/sdcl-49-41b-4","next":"us-sd/sdcl-49-41b-4.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
