{"data":{"id":"us-tn/tenn.-code-ann.-20-12-115","jurisdiction":"us-tn","citation":"Tenn. Code Ann. § 20-12-115","heading":"Actions for overflow of water","body":"In all suits for the recovery of damages occasioned by the overflowing of water by the erection of a dam for a grist or saw mill or other waterworks of utility, the plaintiff, if successful, shall be entitled to full costs, unless the plaintiff's damages do not exceed five dollars ($5.00), in which case the plaintiff shall not recover more costs than damages.","path":["TN Code","Title 20","Chapter 12"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_tn_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:26Z","sha256":"04455d28a59192b988929931faeede8195a46dd289164ef069fc9b042773f404","source_id":"us-tn","stale":false,"prev":"us-tn/tenn.-code-ann.-20-12-114","next":"us-tn/tenn.-code-ann.-20-12-116"},"notice":"GroundRules: Original legal text. Not legal advice."}
