{"data":{"id":"us-tn/tenn.-code-ann.-66-11-130","jurisdiction":"us-tn","citation":"Tenn. Code Ann. § 66-11-130","heading":"Demand for enforcement of lien","body":"Upon written demand of the owner, the owner's agent, or prime contractor, served on the lienor, requiring the lienor to file a complaint, petition, or civil warrant to enforce the lienor's lien, and describing the real property in the demand, the proceeding must be commenced, or the claim filed in a creditors' or foreclosure proceeding, within sixty (60) days after service, or the lien is forfeited.\nAmended by 2020 Tenn. Acts, ch. 749, s 3, eff. 7/1/2020.\nCode 1932, § 7947; T.C.A. (orig. ed.), § 64-1130; Acts 2007 , ch. 189, § 29.","path":["TN Code","Title 66","Chapter 11"],"source_url":"https://oss-data-us.vaquill.ai/v2026.08/us_tn_statutes.parquet","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:26Z","sha256":"af03b9fbe897dcb79f144dc25015678507c76c7197d4ea1da12c305227705875","source_id":"us-tn","stale":false,"prev":"us-tn/tenn.-code-ann.-66-11-129","next":"us-tn/tenn.-code-ann.-66-11-131"},"notice":"GroundRules: Original legal text. Not legal advice."}
