{"data":{"id":"us-tx/tex.-agriculture-code-203.057","jurisdiction":"us-tx","citation":"Tex. Agriculture Code § 203.057","heading":"FEASIBILITY STUDIES.","body":"(a) The board shall establish a process for providing to persons submitting project proposals assistance in locating a person with expertise in hydrology, water resources, or another technical area pertinent to the evaluation of water supply to conduct a feasibility study for a project using a water yield model as described by Section 203.053(b).\n(b) The board may:\n(1) dedicate a portion of the money appropriated to the board that it considers appropriate to fund part or all of a feasibility study under this section; and\n(2) establish procedures to distribute the money under Subdivision (1).\n(c) To receive funding for a feasibility study under Subsection (b), a person must submit to the board an application for funding that includes a statement of the project's anticipated impact on water resources.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 61 (H.B. 1808), Sec. 16, eff. September 1, 2011.","path":["AGRICULTURE CODE","TITLE 7. SOIL AND WATER CONSERVATION","CHAPTER 203. WATER SUPPLY ENHANCEMENT","SUBCHAPTER C. GENERAL POWERS AND DUTIES OF BOARD"],"source_url":"https://statutes.capitol.texas.gov/Docs/AG/htm/AG.203.htm#203.057","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:46:50Z","sha256":"e9b5e0af26abcc36551dffe4ddf84b51f4887da7eb5d8e73e728dd871b1b961d","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-agriculture-code-203.056","next":"us-tx/tex.-agriculture-code-203.101"},"notice":"GroundRules: Original legal text. Not legal advice."}
