{"data":{"id":"us-tx/tex.-agriculture-code-94.012","jurisdiction":"us-tx","citation":"Tex. Agriculture Code § 94.012","heading":"NOTICE OF OPERATION.","body":"After October 14 and before December 17 of each year, the owner, manager, or operator of a packing house shall notify the department in writing of the date packing operations are to begin. The notice is due at least seven days prior to beginning operations.\nActs 1981, 67th Leg., p. 1243, ch. 388, Sec. 1, eff. Sept. 1, 1981.","path":["AGRICULTURE CODE","TITLE 5. PRODUCTION, PROCESSING, AND SALE OF HORTICULTURAL PRODUCTS","SUBTITLE C. GRADING, PACKING, AND INSPECTING HORTICULTURAL PRODUCTS","CHAPTER 94. CITRUS FRUIT MATURITY STANDARDS","SUBCHAPTER B. PACKING HOUSES"],"source_url":"https://statutes.capitol.texas.gov/Docs/AG/htm/AG.94.htm#94.012","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:46:50Z","sha256":"075dd811bf631a376a7166d3985ce8f50b1efd67f086a80ddb9bbb13e25dd252","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-agriculture-code-94.011","next":"us-tx/tex.-agriculture-code-94.021"},"notice":"GroundRules: Original legal text. Not legal advice."}
