{"data":{"id":"us-tx/tex.-government-code-2269.202","jurisdiction":"us-tx","citation":"Tex. Government Code § 2269.202","heading":"CONTRACT PROVISIONS OF CONSTRUCTION MANAGER-AGENT.","body":"The contract between the governmental entity and the construction manager-agent may require the construction manager-agent to provide:\n(1) administrative personnel;\n(2) equipment necessary to perform duties under this subchapter;\n(3) on-site management; and\n(4) other services specified in the contract.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1129 (H.B. 628), Sec. 2.08, eff. September 1, 2011.\nRedesignated from Government Code, Chapter 2267 by Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.001(23), eff. September 1, 2013.","path":["GOVERNMENT CODE","TITLE 10. GENERAL GOVERNMENT","SUBTITLE F. STATE AND LOCAL CONTRACTS AND FUND MANAGEMENT","CHAPTER 2269. CONTRACTING AND DELIVERY PROCEDURES FOR CONSTRUCTION PROJECTS","SUBCHAPTER E. CONSTRUCTION MANAGER-AGENT METHOD"],"source_url":"https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm#2269.202","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:16Z","sha256":"63a513872f72a7cc9009fb1aa17d8fa62e88ae90b0c12de55f3e35f2d7d99ab2","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-government-code-2269.201","next":"us-tx/tex.-government-code-2269.203"},"notice":"GroundRules: Original legal text. Not legal advice."}
