{"data":{"id":"us-tx/tex.-government-code-2269.257","jurisdiction":"us-tx","citation":"Tex. Government Code § 2269.257","heading":"DEFAULT; PERFORMANCE OF WORK.","body":"If a selected trade contractor or subcontractor defaults in the performance of its work or fails to execute a subcontract after being selected in accordance with this subchapter, the construction manager-at-risk may itself fulfill, without advertising, the contract requirements or select a replacement trade contractor or subcontractor to fulfill the contract requirements.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1129 (H.B. 628), Sec. 2.08, eff. September 1, 2011.\nRedesignated from Government Code, Chapter 2267 by Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.001(23), eff. September 1, 2013.","path":["GOVERNMENT CODE","TITLE 10. GENERAL GOVERNMENT","SUBTITLE F. STATE AND LOCAL CONTRACTS AND FUND MANAGEMENT","CHAPTER 2269. CONTRACTING AND DELIVERY PROCEDURES FOR CONSTRUCTION PROJECTS","SUBCHAPTER F. CONSTRUCTION MANAGER-AT-RISK METHOD"],"source_url":"https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm#2269.257","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:16Z","sha256":"406bd04573d6d8ed5b3fa489f4f7603dea918c06f1a4006b8484acc1c5dfd479","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-government-code-2269.256","next":"us-tx/tex.-government-code-2269.258"},"notice":"GroundRules: Original legal text. Not legal advice."}
