{"data":{"id":"us-tx/tex.-government-code-2269.309","jurisdiction":"us-tx","citation":"Tex. Government Code § 2269.309","heading":"SUBMISSION OF DESIGN AFTER SELECTION.","body":"After selection of the design-build firm, that firm's architects or engineers shall submit all design elements for review and determination of scope compliance to the governmental entity or the governmental entity's architect or engineer before or concurrently with construction.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1129 (H.B. 628), Sec. 2.08, eff. September 1, 2011.\nRedesignated from Government Code, Chapter 2267 by Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.001(23), eff. September 1, 2013.","path":["GOVERNMENT CODE","TITLE 10. GENERAL GOVERNMENT","SUBTITLE F. STATE AND LOCAL CONTRACTS AND FUND MANAGEMENT","CHAPTER 2269. CONTRACTING AND DELIVERY PROCEDURES FOR CONSTRUCTION PROJECTS","SUBCHAPTER G. BUILDING USING DESIGN-BUILD METHOD"],"source_url":"https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm#2269.309","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:16Z","sha256":"b7e4f4cdaac22b697f39738c5647c16d9e199fbdfa59a8d8230a71cf89925849","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-government-code-2269.308","next":"us-tx/tex.-government-code-2269.310"},"notice":"GroundRules: Original legal text. Not legal advice."}
