{"data":{"id":"us-tx/tex.-government-code-2269.365","jurisdiction":"us-tx","citation":"Tex. Government Code § 2269.365","heading":"COMPLETION OF DESIGN.","body":"(a) Following selection of a design-build firm under this subchapter, the firm's engineers shall submit all design elements for review and determination of scope compliance to the governmental entity before or concurrently with construction.\n(b) An appropriately licensed design professional shall sign and seal construction documents before the documents are released for construction.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1129 (H.B. 628), Sec. 2.08, eff. September 1, 2011.\nRedesignated from Government Code, Chapter 2267 by Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.001(23), eff. September 1, 2013.","path":["GOVERNMENT CODE","TITLE 10. GENERAL GOVERNMENT","SUBTITLE F. STATE AND LOCAL CONTRACTS AND FUND MANAGEMENT","CHAPTER 2269. CONTRACTING AND DELIVERY PROCEDURES FOR CONSTRUCTION PROJECTS","SUBCHAPTER H. DESIGN-BUILD PROCEDURES FOR CERTAIN CIVIL WORKS PROJECTS"],"source_url":"https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm#2269.365","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:16Z","sha256":"120fe50d148fb7cb51bc426a17ddf2dc4f663e6ef7e8d3566f15d9dd2846a1a9","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-government-code-2269.364","next":"us-tx/tex.-government-code-2269.366"},"notice":"GroundRules: Original legal text. Not legal advice."}
