{"data":{"id":"us-tx/tex.-health-and-safety-code-382.051985","jurisdiction":"us-tx","citation":"Tex. Health and Safety Code § 382.051985","heading":"STANDARD PERMIT FOR CERTAIN TEMPORARY CONCRETE PLANTS FOR PUBLIC WORKS.","body":"(a) The commission shall issue a standard permit that meets the requirements of Section 382.05195 for a temporary concrete plant that performs wet batching, dry batching, or central mixing to support a public works project. A plant operating under the permit:\n(1) may not support a project that is not related to the public works project; and\n(2) must be located in or contiguous to the right-of-way of the public works project.\n(b) A plant permitted under this section may occupy a designated site for not more than 180 consecutive days or to supply material for a single project, but not other unrelated projects.\nAdded by Acts 2023, 88th Leg., R.S., Ch. 1102 (S.B. 1397), Sec. 3, eff. September 1, 2023.","path":["HEALTH AND SAFETY CODE","TITLE 5. SANITATION AND ENVIRONMENTAL QUALITY","SUBTITLE C. AIR QUALITY","CHAPTER 382. CLEAN AIR ACT","SUBCHAPTER C. PERMITS"],"source_url":"https://statutes.capitol.texas.gov/Docs/HS/htm/HS.382.htm#382.051985","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:17Z","sha256":"2135e1296a221c480a49de95da6f1f9c245663076bb8ae4bc9aafb14bd2e8bf4","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-health-and-safety-code-382.05198","next":"us-tx/tex.-health-and-safety-code-382.05199"},"notice":"GroundRules: Original legal text. Not legal advice."}
