{"data":{"id":"us-tx/tex.-local-government-code-284.155","jurisdiction":"us-tx","citation":"Tex. Local Government Code § 284.155","heading":"TIME OF INSTALLATION.","body":"(a) A network provider shall begin the installation for which a permit is granted not later than six months after final approval and shall diligently pursue the installation to completion.\n(b) Notwithstanding Subsection (a), the municipality may place a longer time limit on completion or grant reasonable extensions of time as requested by the network provider.\nAdded by Acts 2017, 85th Leg., R.S., Ch. 591 (S.B. 1004), Sec. 1, eff. September 1, 2017.","path":["LOCAL GOVERNMENT CODE","TITLE 9. PUBLIC BUILDINGS AND GROUNDS","SUBTITLE A. MUNICIPAL PUBLIC BUILDINGS AND GROUNDS","CHAPTER 284. DEPLOYMENT OF NETWORK NODES IN PUBLIC RIGHT-OF-WAY","SUBCHAPTER D. APPLICATIONS AND PERMITS"],"source_url":"https://statutes.capitol.texas.gov/Docs/LG/htm/LG.284.htm#284.155","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:27Z","sha256":"d4aa0fc7ecff936356f14fc4badc9032273d6d2d82a34670fd308af3218524e8","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-local-government-code-284.154","next":"us-tx/tex.-local-government-code-284.156"},"notice":"GroundRules: Original legal text. Not legal advice."}
