{"data":{"id":"us-tx/tex.-special-district-local-laws-code-7803.108","jurisdiction":"us-tx","citation":"Tex. Special District Local Laws Code § 7803.108","heading":"CONSTRUCTION CONTRACTS: PAYMENT.","body":"(a) A construction contract may be paid for in partial payments as the work progresses, based on estimates approved by the district's engineer.\n(b) The payments may not exceed 90 percent of the amount due at the time of the payments as shown by the approved estimates, except that the final approved estimate, including all prior retainage, must be paid in full.\nAdded by Acts 2013, 83rd Leg., R.S., Ch. 112 (S.B. 1026), Sec. 1.02, eff. April 1, 2015.","path":["SPECIAL DISTRICT LOCAL LAWS CODE","TITLE 6. WATER AND WASTEWATER","SUBTITLE E. LEVEE IMPROVEMENT DISTRICTS","CHAPTER 7803. IRVING FLOOD CONTROL DISTRICT SECTION I","SUBCHAPTER C. POWERS AND DUTIES"],"source_url":"https://statutes.capitol.texas.gov/Docs/SD/htm/SD.7803.htm#7803.108","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:41Z","sha256":"214ef191de0285bae418c155ea0cf25ec3d5f2566db9f586fff8bb5a6f240be7","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-special-district-local-laws-code-7803.107","next":"us-tx/tex.-special-district-local-laws-code-7803.109"},"notice":"GroundRules: Original legal text. Not legal advice."}
