{"data":{"id":"us-tx/tex.-special-district-local-laws-code-8369.107","jurisdiction":"us-tx","citation":"Tex. Special District Local Laws Code § 8369.107","heading":"WASTEWATER TREATMENT FACILITY DESIGN APPROVAL.","body":"The district must obtain the approval of the Brazos River Authority for the design of any district wastewater treatment facility.\nAdded by Acts 2009, 81st Leg., R.S., Ch. 1094 (H.B. 4800), Sec. 1, eff. September 1, 2009.","path":["SPECIAL DISTRICT LOCAL LAWS CODE","TITLE 6. WATER AND WASTEWATER","SUBTITLE F. MUNICIPAL UTILITY DISTRICTS","CHAPTER 8369. SAN GABRIEL MUNICIPAL UTILITY DISTRICT NO. 1","SUBCHAPTER C. POWERS AND DUTIES"],"source_url":"https://statutes.capitol.texas.gov/Docs/SD/htm/SD.8369.htm#8369.107","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:41Z","sha256":"ed0ce02d130c88236ca2aafcde1e9c5e416e2864a257de52ee6fb1eccc9f1605","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-special-district-local-laws-code-8369.106","next":"us-tx/tex.-special-district-local-laws-code-8369.108"},"notice":"GroundRules: Original legal text. Not legal advice."}
