{"data":{"id":"us-tx/tex.-special-district-local-laws-code-9016.110","jurisdiction":"us-tx","citation":"Tex. Special District Local Laws Code § 9016.110","heading":"WATER SERVICE DEADLINE.","body":"The district must begin operation of a water system serving at least a part of the district not later than the sixth anniversary of the date that district voters approve the issuance of bonds to provide for the development of the water system.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1043 (H.B. 3111), Sec. 1, eff. June 17, 2011.","path":["SPECIAL DISTRICT LOCAL LAWS CODE","TITLE 6. WATER AND WASTEWATER","SUBTITLE I. WATER CONTROL AND IMPROVEMENT DISTRICTS","CHAPTER 9016. MIDLAND COUNTY UTILITY DISTRICT","SUBCHAPTER C. POWERS AND DUTIES"],"source_url":"https://statutes.capitol.texas.gov/Docs/SD/htm/SD.9016.htm#9016.110","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:41Z","sha256":"2aa69fb0cb0cd410231760633a66e04e19256352a8ab8d5a6182fcc6715b330f","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-special-district-local-laws-code-9016.109","next":"us-tx/tex.-special-district-local-laws-code-9016.111"},"notice":"GroundRules: Original legal text. Not legal advice."}
