{"data":{"id":"us-tx/tex.-transportation-code-223.048","jurisdiction":"us-tx","citation":"Tex. Transportation Code § 223.048","heading":"TIME OF PAYMENT.","body":"The department may not pay a contractor for highway improvement, construction, or maintenance before the 10th day of the month after the month in which the work is performed or the material is used. The department shall make payment as soon after that date as is practical.\nActs 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.","path":["TRANSPORTATION CODE","TITLE 6. ROADWAYS","SUBTITLE B. STATE HIGHWAY SYSTEM","CHAPTER 223. BIDS AND CONTRACTS FOR HIGHWAY PROJECTS","SUBCHAPTER B. CONTRACT PROVISIONS"],"source_url":"https://statutes.capitol.texas.gov/Docs/TN/htm/TN.223.htm#223.048","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:44Z","sha256":"2ffe5335d08faa564fbc952d4d8a7bdaa96076614f28c866d71756b054bb2be3","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-transportation-code-223.047","next":"us-tx/tex.-transportation-code-223.049"},"notice":"GroundRules: Original legal text. Not legal advice."}
