{"data":{"id":"us-tx/tex.-transportation-code-228.0546","jurisdiction":"us-tx","citation":"Tex. Transportation Code § 228.0546","heading":"INVOICE REQUIREMENTS; PAYMENT DUE DATE.","body":"An invoice containing an assessment for the use of a toll project must:\n(1) require payment not later than the 30th day after the date the invoice is mailed; and\n(2) conspicuously state:\n(A) the amount due;\n(B) the date by which the amount due must be paid; and\n(C) that failure to pay the amount due in the required period will result in the assessment of an administrative fee.\nAdded by Acts 2017, 85th Leg., R.S., Ch. 533 (S.B. 312), Sec. 31, eff. September 1, 2017.","path":["TRANSPORTATION CODE","TITLE 6. ROADWAYS","SUBTITLE B. STATE HIGHWAY SYSTEM","CHAPTER 228. STATE HIGHWAY TOLL PROJECTS","SUBCHAPTER B. USE AND OPERATION OF TOLL PROJECTS OR SYSTEMS"],"source_url":"https://statutes.capitol.texas.gov/Docs/TN/htm/TN.228.htm#228.0546","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:44Z","sha256":"97d3ff3e661b72c7808ca2364d1ba588152f27e0228347013672dc236c905ec8","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-transportation-code-228.0545","next":"us-tx/tex.-transportation-code-228.0547"},"notice":"GroundRules: Original legal text. Not legal advice."}
