{"data":{"id":"us-tx/tex.-transportation-code-363.003","jurisdiction":"us-tx","citation":"Tex. Transportation Code § 363.003","heading":"DUTY TO REPAIR; FORFEIT OF TOLLS.","body":"(a) The contractor shall maintain the bridge during the term of the contract.\n(b) A contractor who fails to maintain the bridge forfeits all right to the tolls.\nActs 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.","path":["TRANSPORTATION CODE","TITLE 6. ROADWAYS","SUBTITLE G. TURNPIKES AND TOLL PROJECTS","CHAPTER 363. COUNTY TOLL BRIDGES"],"source_url":"https://statutes.capitol.texas.gov/Docs/TN/htm/TN.363.htm#363.003","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:44Z","sha256":"4a792e6dd1c7124313afb617295f01dc2904379af92fc5d27099e83333bdb9d3","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-transportation-code-363.002","next":"us-tx/tex.-transportation-code-363.004"},"notice":"GroundRules: Original legal text. Not legal advice."}
