{"data":{"id":"us-tx/tex.-transportation-code-373.057","jurisdiction":"us-tx","citation":"Tex. Transportation Code § 373.057","heading":"PROGRESS REPORTS.","body":"After the department or the local toll project entity exercises an option under this subchapter, the department or the local toll project entity, as applicable, shall issue a semiannual report on the progress of the development of the toll project. The report shall be made available to the public.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 1196 (S.B. 19), Sec. 1, eff. June 17, 2011.","path":["TRANSPORTATION CODE","TITLE 6. ROADWAYS","SUBTITLE G. TURNPIKES AND TOLL PROJECTS","CHAPTER 373. TOLL PROJECTS LOCATED IN TERRITORY OF LOCAL TOLL PROJECT ENTITY","SUBCHAPTER B. PROCESS TO DETERMINE ENTITY TO DEVELOP, FINANCE, CONSTRUCT, AND OPERATE TOLL PROJECT"],"source_url":"https://statutes.capitol.texas.gov/Docs/TN/htm/TN.373.htm#373.057","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:44Z","sha256":"8cdccf94ce952ea34a3140008a92b08bd4b9d8a39699db268a5d316fe08c2222","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-transportation-code-373.056","next":"us-tx/tex.-transportation-code-373.058"},"notice":"GroundRules: Original legal text. Not legal advice."}
