{"data":{"id":"us-tx/tex.-utilities-code-103.056","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 103.056","heading":"APPLICABILITY OF RATES.","body":"Temporary or permanent rates set by the railroad commission are prospective and observed from the date of the applicable railroad commission order, except an interim rate order necessary to provide a gas utility the opportunity to avoid confiscation during the period beginning on the date a petition for review is filed with the railroad commission and ending on the date of a final order establishing rates.\nActs 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997.","path":["UTILITIES CODE","TITLE 3. GAS REGULATION","SUBTITLE A. GAS UTILITY REGULATORY ACT","CHAPTER 103. JURISDICTION AND POWERS OF MUNICIPALITY","SUBCHAPTER C. APPEAL OF MUNICIPAL ORDER"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.103.htm#103.056","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"dbf70baace219f067fa3ab3cf90ebbf3aa4e48754568ed410e73cafe0e7e3f0c","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-103.055","next":"us-tx/tex.-utilities-code-104.001"},"notice":"GroundRules: Original legal text. Not legal advice."}
