{"data":{"id":"us-tx/tex.-utilities-code-36.006","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 36.006","heading":"BURDEN OF PROOF.","body":"In a proceeding involving a proposed rate change, the electric utility has the burden of proving that:\n(1) the rate change is just and reasonable, if the utility proposes the change; or\n(2) an existing rate is just and reasonable, if the proposal is to reduce the rate.\nActs 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 36. RATES","SUBCHAPTER A. GENERAL PROVISIONS"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.36.htm#36.006","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"dbf81898a31e41e55462b61b9ff7cc9264efc633e8c45adb67e6aeaa3028c897","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-36.005","next":"us-tx/tex.-utilities-code-36.007"},"notice":"GroundRules: Original legal text. Not legal advice."}
