{"data":{"id":"us-tx/tex.-utilities-code-36.213","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 36.213","heading":"ADJUSTMENT FOR CYBERSECURITY MONITOR COSTS FOR CERTAIN UTILITIES.","body":"(a) This section does not apply to an electric utility that operates solely outside of ERCOT and has not elected to participate in the cybersecurity monitor program under Section 39.1516.\n(b) The commission, on its own motion or on the petition of an electric utility, shall allow the electric utility to recover reasonable and necessary costs incurred in connection with activities under Section 39.1516.\nAdded by Acts 2019, 86th Leg., R.S., Ch. 610 (S.B. 936), Sec. 1, eff. September 1, 2019.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 36. RATES","SUBCHAPTER E. COST RECOVERY AND RATE ADJUSTMENT"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.36.htm#36.213","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"3361d041467509a9c500f7eedb9021ccbf4c82f6b5ae6ea85177870a13a9160d","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-36.212","next":"us-tx/tex.-utilities-code-36.214"},"notice":"GroundRules: Original legal text. Not legal advice."}
