{"data":{"id":"us-tx/tex.-utilities-code-39.003","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 39.003","heading":"CONTESTED CASES.","body":"Unless specifically provided otherwise, each commission proceeding under this chapter, other than a rulemaking proceeding, report, notification, or registration, shall be conducted as a contested case and the burden of proof is on the incumbent electric utility.\nAdded by Acts 1999, 76th Leg., ch. 405, Sec. 39, eff. Sept. 1, 1999.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 39. RESTRUCTURING OF ELECTRIC UTILITY INDUSTRY","SUBCHAPTER A. GENERAL PROVISIONS"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm#39.003","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"6465c256207757b8fa25df0f17c5f712de5895041c96a7eb798c6ee457cd3d10","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-39.002","next":"us-tx/tex.-utilities-code-39.004"},"notice":"GroundRules: Original legal text. Not legal advice."}
