{"data":{"id":"us-tx/tex.-utilities-code-39.166","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 39.166","heading":"RELIABILITY PLAN FOR REGIONS WITH RAPID ELECTRICAL LOAD GROWTH.","body":"(a) The commission shall direct the independent organization certified under Section 39.151 for the ERCOT power region to:\n(1) identify each region in which transmission capacity is insufficient to meet the region's existing and forecasted electrical load, as reasonably determined by the certificated transmission service provider; and\n(2) develop a reliability plan to serve existing and forecasted electrical load in the identified region.\n(b) The commission shall develop a plan to implement each reliability plan adopted under Subsection (a) to ensure timely development and approval of necessary transmission service improvements.\nAdded by Acts 2023, 88th Leg., R.S., Ch. 892 (H.B. 5066), Sec. 3, eff. June 13, 2023.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 39. RESTRUCTURING OF ELECTRIC UTILITY INDUSTRY","SUBCHAPTER D. MARKET STRUCTURE"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm#39.166","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"e031543d9622a5d1183a20970ebab595501236dbd90ffd02aaca7202cada5a63","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-39.165","next":"us-tx/tex.-utilities-code-39.1675"},"notice":"GroundRules: Original legal text. Not legal advice."}
