{"data":{"id":"us-tx/tex.-utilities-code-39.307","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 39.307","heading":"TRUE-UP.","body":"A financing order shall include a mechanism requiring that transition charges be reviewed and adjusted at least annually, within 45 days of the anniversary date of the issuance of the transition bonds, to correct any overcollections or undercollections of the preceding 12 months and to ensure the expected recovery of amounts sufficient to timely provide all payments of debt service and other required amounts and charges in connection with the transition bonds.\nAdded by Acts 1999, 76th Leg., ch. 405, Sec. 39, eff. Sept. 1, 1999.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 39. RESTRUCTURING OF ELECTRIC UTILITY INDUSTRY","SUBCHAPTER G. SECURITIZATION"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm#39.307","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"c160fc4b92ffff63d73f80b65835199283abdad6b08eae64f54f4d65ec589778","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-39.306","next":"us-tx/tex.-utilities-code-39.308"},"notice":"GroundRules: Original legal text. Not legal advice."}
