{"data":{"id":"us-tx/tex.-utilities-code-39.9055","jurisdiction":"us-tx","citation":"Tex. Utilities Code § 39.9055","heading":"EXAMINATION OF DEMAND RESPONSE POTENTIAL OF SEAWATER DESALINATION PROJECTS.","body":"The commission and the ERCOT independent system operator shall study the potential for seawater desalination projects to participate in existing demand response opportunities in the ERCOT market. To the extent feasible, the study shall determine whether the operational characteristics of seawater desalination projects enable projects of that kind to participate in ERCOT-operated ancillary services markets or other competitively supplied demand response opportunities. The study shall also determine the potential economic benefit to a seawater desalination project if the project is able to reduce its demand during peak pricing periods. The commission shall include the results of the study in the report required by Section 12.203.\nAdded by Acts 2015, 84th Leg., R.S., Ch. 829 (H.B. 4097), Sec. 2, eff. June 17, 2015.\nAmended by:\nActs 2023, 88th Leg., R.S., Ch. 410 (H.B. 1500), Sec. 35, eff. September 1, 2023.","path":["UTILITIES CODE","TITLE 2. PUBLIC UTILITY REGULATORY ACT","SUBTITLE B. ELECTRIC UTILITIES","CHAPTER 39. RESTRUCTURING OF ELECTRIC UTILITY INDUSTRY","SUBCHAPTER Z. MISCELLANEOUS PROVISIONS"],"source_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm#39.9055","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:45Z","sha256":"9466b15c8773ce33152152b3be9ea7b67a9c5d0bb23693da4236cd25d07ac44a","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-utilities-code-39.9054","next":"us-tx/tex.-utilities-code-39.906"},"notice":"GroundRules: Original legal text. Not legal advice."}
