{"data":{"id":"us-tx/tex.-water-code-15.216","jurisdiction":"us-tx","citation":"Tex. Water Code § 15.216","heading":"CERTIFICATE OF APPROVAL.","body":"The board may consider the following as grounds for refusal to give a certificate of approval for any construction contract:\n(1) failure to construct the project according to approved plans;\n(2) failure to construct the project in accordance with sound engineering principles; or\n(3) failure to comply with any terms of the contract.\nAdded by Acts 1985, 69th Leg., ch. 133, Sec. 2.05. Amended by Acts 1987, 70th Leg., ch. 977, Sec. 14, eff. June 19, 1987.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE C. WATER DEVELOPMENT","CHAPTER 15. TEXAS WATER ASSISTANCE PROGRAM","SUBCHAPTER D. WATER BOND INSURANCE PROGRAM"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.15.htm#15.216","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"73a5549a186794643c2908cebc0940e30e3d355eddb406dda1aa93667126d7fc","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-15.215","next":"us-tx/tex.-water-code-15.217"},"notice":"GroundRules: Original legal text. Not legal advice."}
