{"data":{"id":"us-tx/tex.-water-code-27.155","jurisdiction":"us-tx","citation":"Tex. Water Code § 27.155","heading":"REPORTING OF INJECTION AND RECOVERY VOLUMES.","body":"(a) A project operator shall install a meter on each ASR injection well and ASR recovery well associated with the aquifer storage and recovery project.\n(b) Each calendar month, the project operator shall provide to the commission a written or electronic report showing for the preceding calendar month the volume of water:\n(1) injected for storage; and\n(2) recovered for beneficial use.\nAdded by Acts 2015, 84th Leg., R.S., Ch. 505 (H.B. 655), Sec. 3, eff. June 16, 2015.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE D. WATER QUALITY CONTROL","CHAPTER 27. INJECTION WELLS","SUBCHAPTER G. AQUIFER STORAGE AND RECOVERY PROJECTS"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.27.htm#27.155","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"bb48a2f3e3aee35000e6ccecde306237c8246304ad08ad2018527f6adef31715","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-27.154","next":"us-tx/tex.-water-code-27.156"},"notice":"GroundRules: Original legal text. Not legal advice."}
