{"data":{"id":"us-tx/tex.-water-code-27.205","jurisdiction":"us-tx","citation":"Tex. Water Code § 27.205","heading":"REPORTING OF INJECTION VOLUMES.","body":"(a) A project operator shall install a meter on each recharge injection well associated with the aquifer recharge project.\n(b) Each calendar year, the project operator shall provide to the commission a written or electronic report showing for the preceding calendar year the volume of water injected for recharge.\nAdded by Acts 2019, 86th Leg., R.S., Ch. 742 (H.B. 720), Sec. 3, eff. June 10, 2019.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE D. WATER QUALITY CONTROL","CHAPTER 27. INJECTION WELLS","SUBCHAPTER H. AQUIFER RECHARGE PROJECTS"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.27.htm#27.205","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"37b028418ccd1a2b5adab3325ac87fe9962d94a872a7da0ddaa5b0b242dd7ce7","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-27.204","next":"us-tx/tex.-water-code-27.206"},"notice":"GroundRules: Original legal text. Not legal advice."}
