{"data":{"id":"us-tx/tex.-water-code-27.206","jurisdiction":"us-tx","citation":"Tex. Water Code § 27.206","heading":"REPORTING OF WATER QUALITY DATA.","body":"A project operator shall:\n(1) perform water quality testing annually on water to be injected into a geologic formation as part of the aquifer recharge project; and\n(2) provide the results of the testing described by Subdivision (1) in written or electronic form to the commission.\nAdded by Acts 2019, 86th Leg., R.S., Ch. 742 (H.B. 720), Sec. 3, eff. June 10, 2019.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE D. WATER QUALITY CONTROL","CHAPTER 27. INJECTION WELLS","SUBCHAPTER H. AQUIFER RECHARGE PROJECTS"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.27.htm#27.206","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"902ee0c4b60bb46275637ce866f85194a4eb289eef116d7c26c30a866685fadd","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-27.205","next":"us-tx/tex.-water-code-27.207"},"notice":"GroundRules: Original legal text. Not legal advice."}
