{"data":{"id":"us-tx/tex.-water-code-28.038","jurisdiction":"us-tx","citation":"Tex. Water Code § 28.038","heading":"ENVIRONMENTAL REPORT.","body":"If an environmental report, environmental assessment, or environmental impact statement of any kind that includes an analysis of the environmental impacts of the shaft construction or operation is required by any federal or state agency before approval to construct the shaft, the environmental document, along with evidence of the needed approvals that have been granted, must be submitted to the commission as part of the shaft permit application, and the commission shall make the environmental document available for public review and comment for a period of not less than 30 days before the application for the shaft permit is considered.\nAdded by Acts 1983, 68th Leg., p. 651, ch. 148, Sec. 1, eff. May 18, 1983. Amended by Acts 1985, 69th Leg., ch. 795, Sec. 1.127, eff. Sept. 1, 1985.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE D. WATER QUALITY CONTROL","CHAPTER 28. WATER WELLS AND DRILLED OR MINED SHAFTS","SUBCHAPTER C. DRILLED OR MINED SHAFTS"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.28.htm#28.038","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"7f18bb632808ecd2c9189f48c3dd6fb6045098b6ff2d8c38408194fd42b40ea7","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-28.037","next":"us-tx/tex.-water-code-28.051"},"notice":"GroundRules: Original legal text. Not legal advice."}
