{"data":{"id":"us-tx/tex.-water-code-28a.051","jurisdiction":"us-tx","citation":"Tex. Water Code § 28A.051","heading":"REGISTRATION.","body":"(a) The responsible party for an aggregate production operation shall register the operation with the commission not later than the 10th business day before the beginning date of extraction activities and shall renew the registration annually as extraction activities continue.\n(b) After extraction activities at an aggregate production operation have ceased and the operator has notified the commission in writing that the operations have ceased, the requirements of this chapter are not applicable to the aggregate production operation.\nAdded by Acts 2011, 82nd Leg., R.S., Ch. 107 (H.B. 571), Sec. 1, eff. September 1, 2011.","path":["WATER CODE","TITLE 2. WATER ADMINISTRATION","SUBTITLE D. WATER QUALITY CONTROL","CHAPTER 28A. CERTAIN AGGREGATE PRODUCTION OPERATIONS","SUBCHAPTER B. REGISTRATION AND INSPECTION"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.28A.htm#28A.051","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"84b4a065e9fe42856fc824f8001077c01f1ef3436fe98de5f3e1466dcfecd5fd","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-28a.001","next":"us-tx/tex.-water-code-28a.052"},"notice":"GroundRules: Original legal text. Not legal advice."}
