{"data":{"id":"us-tx/tex.-water-code-51.410","jurisdiction":"us-tx","citation":"Tex. Water Code § 51.410","heading":"ENGINEER'S REPORT.","body":"(a) Before an election is held to authorize the issuance of bonds, an engineer's report, which includes the plans and improvements to be constructed together with maps, plats, profiles, and data showing and explaining the engineer's report, shall be filed in the office of the district and shall be available for public inspection.\n(b) The engineer's report shall contain a detailed estimate of the cost of improvements, including the cost of any property to be purchased, and an estimate of the time required to complete the improvements to the degree to which they may provide service.\n(c) The board shall consider the engineer's report and may make changes in the report and note them in the minutes.\nActs 1971, 62nd Leg., p. 337, ch. 58, Sec. 1, eff. Aug. 30, 1971.","path":["WATER CODE","TITLE 4. GENERAL LAW DISTRICTS","CHAPTER 51. WATER CONTROL AND IMPROVEMENT DISTRICTS","SUBCHAPTER K. ISSUANCE OF BONDS"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.51.htm#51.410","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"49de829a7d9bb949f07f72476c567078002d5854f77dbc603311e812b46086f1","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-51.408","next":"us-tx/tex.-water-code-51.411"},"notice":"GroundRules: Original legal text. Not legal advice."}
