{"data":{"id":"us-tx/tex.-water-code-57.116","jurisdiction":"us-tx","citation":"Tex. Water Code § 57.116","heading":"ENGINEER'S CONSTRUCTION REPORT.","body":"(a) As work progresses on the district's improvements, the engineer shall make a report to the board, showing in detail whether or not the contract is being fulfilled.\n(b) When the work is completed, the engineer shall make a detailed report to the board, showing whether or not the contract has been completely fulfilled, and if not, in what particular it has not been fulfilled.\nActs 1971, 62nd Leg., p. 110, ch. 58, Sec. 1, eff. Aug. 30, 1971. Amended by Acts 2003, 78th Leg., ch. 248, Sec. 38, 39, eff. June 18, 2003.","path":["WATER CODE","TITLE 4. GENERAL LAW DISTRICTS","CHAPTER 57. LEVEE IMPROVEMENT DISTRICTS","SUBCHAPTER D. POWERS AND DUTIES"],"source_url":"https://statutes.capitol.texas.gov/Docs/WA/htm/WA.57.htm#57.116","current_through":"89th 2nd Called Legislative Session, 2025","vintage":"","retrieved_at":"2026-08-27T01:47:48Z","sha256":"241ac46c5819aaef280534a2e4c5b259aa9deacf2e4f82980ce6b414b6f47840","source_id":"us-tx","stale":false,"prev":"us-tx/tex.-water-code-57.111","next":"us-tx/tex.-water-code-57.117"},"notice":"GroundRules: Original legal text. Not legal advice."}
