{"data":{"id":"us-ut/utah-code-11-45-205","jurisdiction":"us-ut","citation":"Utah Code § 11-45-205","heading":"Approval of loan.","body":"(1) In approving a loan, the office shall:\n(a) review the loan application, plans, and specifications for the project;\n(b) determine whether or not to grant the loan by applying the office's eligibility criteria; and\n(c) if the loan is granted, prioritize the energy efficiency project by applying the office's priority criteria.\n(2) The office may provide conditions on a loan to ensure that:\n(a) the proceeds of the loan will be used to pay the cost of the project; and\n(b) the project will be completed.","path":["Title 11 Cities, Counties, and Local Taxing Units","Chapter 11-45 Loan Program for Energy Efficiency Projects","Part 11-45-2 Energy Efficiency Fund"],"source_url":"https://le.utah.gov/xcode/Title11/Chapter45/11-45-S205.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"40061a61293ec42f0e113e604d34fe4b826b564b241b2535a455a5c08937ddb3","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-11-45-204","next":"us-ut/utah-code-11-46-101"},"notice":"GroundRules: Original legal text. Not legal advice."}
