{"data":{"id":"us-ut/utah-code-17-78-303","jurisdiction":"us-ut","citation":"Utah Code § 17-78-303","heading":"Distribution of waters -- Operation of projects.","body":"The duty of distributing the waters of and operating the flood control project when completed shall rest upon the state engineer described in Section 73-2-1, provided, that the cost of such distribution and operation of the project by the state engineer shall be borne by the county entering into the cooperative contract with the United States of America for the construction and the operation of the flood control project.","path":["Title 17 Counties","Chapter 17-78 County Property, Programs, and Entities","Part 17-78-3 Flood Control Projects and Drought Emergencies"],"source_url":"https://le.utah.gov/xcode/Title17/Chapter78/17-78-S303.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"f632ab14f55a91ada442ff597ce524c1b67c1b5563059ea1d2246a507899ab25","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-17-78-302","next":"us-ut/utah-code-17-78-304"},"notice":"GroundRules: Original legal text. Not legal advice."}
