{"data":{"id":"us-ut/utah-code-19-3-311","jurisdiction":"us-ut","citation":"Utah Code § 19-3-311","heading":"Length of license.","body":"(1) Any construction and operating license shall be issued for a term established by department rule, but the term may not be longer than 20 years.\n(2) The term of the license may be extended beyond 20 years only by approval of the department, the Legislature, and the governor.","path":["Title 19 Environmental Quality Code","Chapter 19-3 Radiation Control Act","Part 19-3-3 Placement of High Level Nuclear Waste"],"source_url":"https://le.utah.gov/xcode/Title19/Chapter3/19-3-S311.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"744e64d980a8ef6ccc3b8af6f021acceeab9fec53250d6f491252930acc5c1fb","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-19-3-310","next":"us-ut/utah-code-19-3-312"},"notice":"GroundRules: Original legal text. Not legal advice."}
