{"data":{"id":"us-ut/utah-code-38-1a-604","jurisdiction":"us-ut","citation":"Utah Code § 38-1a-604","heading":"Notice of final lien waiver.","body":"(1) After a notice of intent to finance is filed under Section 38-1a-603 on a project property, each subcontractor that has filed a preliminary notice pertaining to the project property may file with the registry a final lien waiver.\n(2) The final lien waiver described in Subsection (1) may be filed on the registry even if no notice of intent to finance was filed on the registry.","path":["Title 38 Liens","Chapter 38-1a Preconstruction and Construction Liens","Part 38-1a-6 Construction Loans"],"source_url":"https://le.utah.gov/xcode/Title38/Chapter1a/38-1a-S604.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"f00efb4deba9ad692c3822e132087853c00c8d6fd20a673582310d24ee6973b6","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-38-1a-603","next":"us-ut/utah-code-38-1a-701"},"notice":"GroundRules: Original legal text. Not legal advice."}
