{"data":{"id":"us-ut/utah-code-53g-4-1002","jurisdiction":"us-ut","citation":"Utah Code § 53G-4-1002","heading":"New industrial plants in school district -- Duty of school district.","body":"A school district confronted with actual or anticipated large increases in enrollment because of the construction of a new industrial plant or plants to a degree that new buildings or additions to existing buildings are required shall make the following efforts to raise funds to meet those building needs:\n(1) bond to its maximum capacity and maintain maximum bonding by rebonding at least once every other year until building needs are met;\n(2) maintain an annual property tax levy for capital outlay and debt service combined of not less than .0036 per dollar of taxable value; and\n(3) initiate any action necessary to qualify for any state, federal, or other funds for capital outlay for which the district may be eligible.","path":["Title 53G Public Education System -- Local Administration","Chapter 53G-4 School Districts","Part 53G-4-10 School Construction Due to New Industrial Plants"],"source_url":"https://le.utah.gov/xcode/Title53G/Chapter4/53G-4-S1002.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"e0f139099924a85216773ba9111dfd5e253b38ef3cf8c5dc2cb3e6f40bcdf180","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-53g-4-1001","next":"us-ut/utah-code-53g-4-1003"},"notice":"GroundRules: Original legal text. Not legal advice."}
