{"data":{"id":"us-ut/utah-code-54-15-108","jurisdiction":"us-ut","citation":"Utah Code § 54-15-108","heading":"Damages and fines for connecting a customer generation system to more than one customer.","body":"If an independent energy producer that is supplying energy to a customer described in Subsection 54-2-201(3)(a) violates the limitation described in Subsection 54-2-201(3)(b)(i), the commission may:\n(1) award damages to an electrical corporation for actual and consequential damages to the electrical corporation; and\n(2) assess a fine against the independent energy producer or person responsible for the violation.","path":["Title 54 Public Utilities","Chapter 54-15 Net Metering of Electricity"],"source_url":"https://le.utah.gov/xcode/Title54/Chapter15/54-15-S108.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"59c5d49f00847dadb7073a5d3f9a846624f690f299ab4c182f4d55225cc10ba6","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-54-15-107","next":"us-ut/utah-code-54-15-601"},"notice":"GroundRules: Original legal text. Not legal advice."}
