{"data":{"id":"us-ut/utah-code-54-18-302","jurisdiction":"us-ut","citation":"Utah Code § 54-18-302","heading":"Public workshops.","body":"After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall:\n(1) conduct informal public workshops at locations along the proposed corridor to provide information about:\n(a) the high voltage power line; and\n(b) the process for obtaining a land use permit; and\n(2) provide notice of the public workshops at least 14 days before a public workshop to:\n(a) a newspaper of general circulation in the target study area;\n(b) radio stations in the target study area; and\n(c) an affected entity.","path":["Title 54 Public Utilities","Chapter 54-18 Siting of High Voltage Power Line Act","Part 54-18-3 Notification - Process for Obtaining Land Use Permit - Appeal"],"source_url":"https://le.utah.gov/xcode/Title54/Chapter18/54-18-S302.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"95821a604462c43881687dd9657d4c7ccd03bf08986e58e0b159e176c5f89927","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-54-18-301","next":"us-ut/utah-code-54-18-303"},"notice":"GroundRules: Original legal text. Not legal advice."}
