{"data":{"id":"us-ut/utah-code-54-26-601","jurisdiction":"us-ut","citation":"Utah Code § 54-26-601","heading":"Large load customer requirements -- Cost allocation.","body":"A large load customer shall pay all just and reasonable large load incremental costs necessary to receive electric service, including the costs of:\n(1) generation resources;\n(2) distribution system upgrades;\n(3) to the extent permitted by federal law, and, as applicable, approved by the Federal Energy Regulatory Commission:\n(a) transmission system improvements, including network upgrades; and\n(b) interconnection facilities;\n(4) transmission service; and\n(5) other necessary infrastructure.","path":["Title 54 Public Utilities","Chapter 54-26 Large-Scale Electric Service Requirements","Part 54-26-6 Customer Requirements and Accounting"],"source_url":"https://le.utah.gov/xcode/Title54/Chapter26/54-26-S601.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"cdcde37487003a856395bcf30663e1c73c8f24ec360834a8998983842095c654","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-54-26-505","next":"us-ut/utah-code-54-26-602"},"notice":"GroundRules: Original legal text. Not legal advice."}
