{"data":{"id":"us-ut/utah-code-54-26-802","jurisdiction":"us-ut","citation":"Utah Code § 54-26-802","heading":"Commission review.","body":"The commission shall:\n(1) conduct a review of this chapter before October 31, 2027, and every three years thereafter;\n(2) conduct an investigation with stakeholder input and public comment and prepare a report that includes:\n(a) data on program participation;\n(b) analysis of impacts on electrical rates;\n(c) assessment of transmission system reliability; and\n(d) recommendations regarding whether to:\n(i) extend the program;\n(ii) modify program requirements; or\n(iii) allow the program to close to new participants; and\n(3) provide the report described in Subsection (2) and any recommendations to the Public Utilities, Energy, and Technology Interim Committee.","path":["Title 54 Public Utilities","Chapter 54-26 Large-Scale Electric Service Requirements","Part 54-26-8 Application and Review"],"source_url":"https://le.utah.gov/xcode/Title54/Chapter26/54-26-S802.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"3ef2bf2abc4c37f165e1ebdde3389c148440aca981865a51490543f9a0c05d86","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-54-26-801","next":"us-ut/utah-code-54-26-901"},"notice":"GroundRules: Original legal text. Not legal advice."}
