{"data":{"id":"us-ut/utah-code-54-8a-10.5","jurisdiction":"us-ut","citation":"Utah Code § 54-8a-10.5","heading":"Installation and location of sewer lateral cleanouts -- Records.","body":"(1)\n(a) An operator or person installing or replacing a sewer lateral cleanout beginning August 1, 2009 shall install or replace the sewer lateral cleanout in a manner so that the lateral can be located, including:\n(i) house sheets; or\n(ii) electronic markers.\n(b) An operator or person installing a sewer lateral cleanout shall notify the sewer operator of the sewer lateral cleanout location for record keeping purposes.\n(2) Beginning on August 1, 2009, a sewer operator shall maintain records identifying where all new, replaced, or contractor-identified sewer lateral cleanouts are located within the sewer operator's jurisdiction.\n(3)\n(a) A sewer operator shall provide to an excavator information in the sewer operator's possession pertaining to a sewer lateral cleanout location within the sewer operator's jurisdiction.\n(b) The sewer operator shall provide the information within 48 hours of the excavator's request.","path":["Title 54 Public Utilities","Chapter 54-8a Damage to Underground Utility Facilities"],"source_url":"https://le.utah.gov/xcode/Title54/Chapter8a/54-8a-S10.5.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"328f5c0aaad5857c0b736c7ddf894bbb7c521f42af13092cc79eeec4c7792d50","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-54-8a-10","next":"us-ut/utah-code-54-8a-11"},"notice":"GroundRules: Original legal text. Not legal advice."}
